Hartz Mountain Industries, Inc.
Raymond Plaza Twin Office Towers

Newark, New Jersey
project.jpg (11097 bytes)
   Hartz Mountain Industries, Inc., developer, builder and pile driver, is building this beautiful 16-story twin tower complex that includes a 5-story parking garage.
   In March of 1990 Hartz called us in, explaining they had a monumental problem at one of their sites. Straight pipe was specified to carry a 60-ton design load, however, after several pipe test piles were driven, it was obvious they would have to go all the way to rock, which a soil boring showed to be at 198-ft.
   Hartz’s engineers asked, "Would you please review soil data to see if your uniformly-tapered Monotube would perform within a reasonable depth?"
   Upon analysis of the data we felt our Monotube would develop at least the 60-ton design load at a maximum of 65 feet, and agreed to donate them enough test piles to prove our belief.
  

   Several Monotubes were driven around the large site and the results were even better than anticipated.
   The design load was increased from 60 tons on the pipe to 80 tons on the 1 2" Monotubes thus enabling a reduc-tion in the number of piles required by over 400. The average length Monotube pile in the completed project was 56-ft., thus the individual pile length driven was reduced by over 70%!
   Hartz Mountain Industries, in the period May - July 1990, ordered and installed 1171 - 7-gauge, 12-in diameter Monotube piles realizing a multi-million dollar savings that made the project economically feasible.
   We like to say they’ve taken advantage of Monotube’s "solid economic" benefits.

  view test data...
SUMMARY
1600+ 60-Ton Pipe Piles Specified
1171 - 80-Ton Monotubes did the job
(33% increased design load - 400+ less piles)
56’ Monotubes versus 198’ Pipe Piles
(Over 70% Length Reduction)
 


Monotube Pile Corporation is a member of The Davidson Group of companies.

Davidson Pipe Supply ˇ Specialty Pipe & Tube ˇ T&A Valve Industries ˇ Monotube ˇ Gilmour Supply

The Monotube Pile Corporation provides technical assistance and piles to contractors around the world. Our unique brand of tapered and fluted cross-section piles are cold-processed to increase tensile yield strength of the steel. Pile sections are self-aligning for joint welding utilizing a unique telescopic design. ˇ
Contents CopyrightŠ 1998-2010 Davidson Pipe Supply Co. All rights reserved.